top of page
Abstract Shapes

Explore our projects

Plant Optimization

Plant Optimization

PHOTO-2023-06-26-19-49-25.jpg

The Problem

The equipment in a small treatment plant required maintenance and repairs to ensure optimal operation.

The Goal

Perform necessary maintenance and repairs to enhance efficiency and prevent operational issues.

The Result

The plant achieved improved performance and reliability, ensuring smooth operations and reducing potential downtime.

Control Panel Upgrade

Control Panel Upgrade

2B26CBA6-9852-4759-BBF0-6A1E26BBF724.JPG

The existing FOXBORO control panel had obsolete modules, posing a risk to the efficiency and reliability of the treatment plant

The Problem

Upgrade the outdated Foxboro modules while ensuring uninterrupted plant operations.

The Goal

A temporary control panel was implemented to maintain functionality during the upgrade, minimizing downtime and ensuring a smooth transition to the new system.

The Result

CIP Operation

CIP Operation

PHOTO-2023-05-09-19-17-36.jpg

The CIP (Clean-in-Place) system required an upgrade with automated valves, pneumatic air, and a modern control system to enhance efficiency and reliability.

The Problem

Implement a PLC-based Control Logic system with automated valves and pneumatic air to optimize the CIP process.

The Goal

A fully integrated control system was installed, improving automation, reducing manual intervention, and ensuring a more efficient and reliable CIP operation

The Result

Engineering Solutions Works

Home
About
Contact

Contact: 787-662-5735

Our Location:

Ángora Industrial Park Avenida Angora,

HIGHWAY 1KM. 33, 3, Caguas, Puerto Rico 00725

bottom of page