Engineering Solutions Works

Explore our projects
Plant Optimization
Plant Optimization

The Problem
The equipment in a small treatment plant required maintenance and repairs to ensure optimal operation.
The Goal
Perform necessary maintenance and repairs to enhance efficiency and prevent operational issues.
The Result
The plant achieved improved performance and reliability, ensuring smooth operations and reducing potential downtime.
Control Panel Upgrade
Control Panel Upgrade

The existing FOXBORO control panel had obsolete modules, posing a risk to the efficiency and reliability of the treatment plant
The Problem
Upgrade the outdated Foxboro modules while ensuring uninterrupted plant operations.
The Goal
A temporary control panel was implemented to maintain functionality during the upgrade, minimizing downtime and ensuring a smooth transition to the new system.
The Result
CIP Operation
CIP Operation

The CIP (Clean-in-Place) system required an upgrade with automated valves, pneumatic air, and a modern control system to enhance efficiency and reliability.
The Problem
Implement a PLC-based Control Logic system with automated valves and pneumatic air to optimize the CIP process.
The Goal
A fully integrated control system was installed, improving automation, reducing manual intervention, and ensuring a more efficient and reliable CIP operation
The Result
Engineering Solutions Works
Home
About
Contact
Contact: 787-662-5735
Our Location:
Ángora Industrial Park Avenida Angora,
HIGHWAY 1KM. 33, 3, Caguas, Puerto Rico 00725